Crawl space work in Burien answers to three sets of rules: Washington's residential code for ground covers and vents, the state energy code for floor insulation, and the city's own limits on slopes, shorelines and trees. Normandy Park adds its own permit and stormwater steps.

This guide is general information in plain words, with links to the official text. It is not legal advice, and the building department has the last word on your project.

Who writes the crawl space rules

Washington builds its residential code from the national model code but changes it, and the state version is what applies in Burien. The crawl space rules sit in chapter 51-51 WAC, the state residential code, mostly in one section, WAC 51-51-0408. Floor insulation is set separately in the residential energy code, chapter 51-11R WAC. The State Building Code Council adopts both and publishes which edition is in force.

Cities enforce those codes and add land-use rules of their own. For a Burien homeowner the local layers that touch crawl space work are the critical areas code, the Shoreline Master Program, the tree code and the permit process.

QuestionWhere the answer lives
Ground cover, vents, sealed crawl spacesWAC 51-51-0408
Floor insulation level and fitTable R402.1.3 and R402.2.7
Slopes, landslide and erosion areas in BurienBMC 19.40
Lots near Puget Sound or Lake BurienBurien Shoreline Master Program
Trees near a drain trench or outletBurien tree regulations
Permits in BurienPermit Center
Permits in Normandy ParkNormandy Park permits
Contractor registrationRCW 18.27.100 and L&I Verify

The ground cover rule

Every crawl space with exposed soil needs a cover. WAC 51-51-0408 calls for six-mil black polyethylene or an approved equal laid over the soil, with joints lapped 6 inches and the sheet carried to the foundation wall.

Three details trip up older houses. The plastic should be black, so the clear sheeting found under many 1960s ramblers doesn't match the current wording. It should reach the walls, so a sheet that has slid into the middle of the space leaves the edges bare. And it should be continuous, so torn patches around piers and plumbing count as gaps. Half of Burien's homes were built before 1966, the median in American Community Survey figures on Census Reporter, so a cover that old has usually failed in at least one of those ways.

A heavier liner than six mil is allowed, because the code sets a minimum. The vapor barrier installation page explains the thicknesses in use.

The vent rule for ordinary crawl spaces

A vented crawl space needs enough opening to the outside air. Under WAC 51-51-0408, the minimum is 1 square foot of net vent area for every 300 square feet of crawl space floor. Vent coverings must have openings no larger than a quarter inch, which keeps rodents out as well as rain.

The ratio can drop to 1 square foot per 1,500 square feet when the ground is covered with a Class I vapor retarder, and in that case the code also asks for a radon vent. Washington ties radon to vent area because less ventilation leaves more soil gas under the floor.

Quarter-inch openings line up with health guidance. Public Health – Seattle & King County says rats can squeeze through a hole the size of a quarter and recommends quarter-inch hardware cloth over openings (PHSKC fact sheet), and the Washington State Department of Health also advises screening openings. A rusted or pushed-in vent screen is both a code problem and a pest problem.

Blocking vents in a cold snap

Temporary vent blocks during a freeze are a common habit here, and they protect pipes. Seattle Public Utilities says pipes exposed to drafts from open foundation vents are most at risk, advises blocking vents in cold weather and reopening them afterward to prevent dry rot, and notes that the water shut-off is often in the crawl space (SPU). Blocking vents for a few nights is maintenance. Closing them for good is a design change, and that brings in the sealed crawl space rules.

The rules for a sealed crawl space

Outside the seven high-radon counties where Appendix AF bars it, a crawl space with no vents to the outside is allowed in Washington where it meets section R408.3 of WAC 51-51-0408, which lists two numbered items:

  1. A Class I vapor retarder with a radon system. A continuous Class I vapor retarder over all exposed soil, seams lapped 6 inches and sealed or taped, edges carried at least 6 inches up the stem wall and sealed there, together with a radon system built to the code's Appendix AF.
  2. Continuous mechanical exhaust of 1 cubic foot per minute for every 50 square feet of crawl space floor, discharged outside.

That second item is where Washington differs most from encapsulation brochures written for other states. A sealed liner and a dehumidifier alone do not meet the state's wording for an unvented crawl space. The code puts no "and" or "or" between the two numbered items, so the building official confirms how the rule applies to your house before work starts. Any quote to seal a Burien crawl space should name which items it includes and how the exhaust is handled. The cost guide shows how these items affect the price, and the crawl space encapsulation page explains the design.

Radon and testing

Radon comes from the soil, and the EPA calls it the leading cause of lung cancer among non-smokers. King County is in the EPA's lowest radon zone, but the EPA map for Washington says homes should be tested regardless of zone, and the Washington State Department of Health calls testing the first step. Test before you seal a crawl space and again afterward.

Floor insulation under the energy code

Where the floor above a crawl space is insulated, the Washington State Energy Code calls for R-30 in the state's climate zones (Table R402.1.3). Section R402.2.7 adds the fit: the insulation must stay in permanent contact with the underside of the subfloor, or fill the framing cavity from top to bottom, and a baffle is needed where the top of a foundation vent sits above the insulation.

In practice that rules out batts drooping between the joists. Wire supports, strapping or netting that hold the insulation tight are part of a code-minded job. In a sealed crawl space the insulation may move to the walls instead, but that is a design decision to make with the code path in hand. See crawl space insulation.

Slopes and Burien's critical areas

Burien regulates geologically hazardous areas, including landslide, erosion and seismic hazard areas, under BMC 19.40, with a critical areas map behind it. The city's 2025 Hazard Mitigation Plan names the main landslide risk areas: Puget Sound coastal properties, large ravines, and the steep slopes on the west edge of the Green/Duwamish valley. The same plan says the city hired a geotechnical firm in 2024 to assess its most vulnerable slopes and that new construction must be permitted on the strength of a geotechnical analysis.

Real slides show why this matters. In January 2022 a landslide closed the road where Sylvester Rd SW becomes SW 172nd St, with a small wall planned and the road reopening on January 24, according to the City of Burien. In December 2007, earth at the top of the Shorewood Drive slope collapsed onto homes on Cove Point Road below, with eight evacuated, as Westside Seattle reported.

Work inside an existing crawl space rarely touches the slope itself. Outside work can: a drain outlet trenched across a bluff, a dispersion trench at the top of a ravine, or a sump line daylighting onto a steep yard. On those lots, call the Permit Center before the design is final. Water dumped on a hillside is one of the things slope rules exist to prevent. The town pages for Seahurst, Three Tree Point and Shorewood describe those slopes street by street, and the post on what past Burien landslides say about hillside houses covers the history and the warning signs.

Shoreline lots and Lake Burien

Burien's Shoreline Master Program covers the marine shoreline and Lake Burien, including land 200 feet landward of the ordinary high-water mark, under BMC Title 20. Homes along Seahurst, Three Tree Point and the lake can fall inside that band.

Replacing a ground cover under an existing house is unlikely to be a shoreline issue. New outdoor drainage, regrading or vegetation removal inside the band can be. The city's tree regulations say any tree in a shoreline management area needs a permit to remove, whatever its size. If a drain route runs past a tree near the water, settle the route with the city first. The Lake Burien page covers lakeside houses.

Trees and drain trenches anywhere in the city

Away from the water, Burien's tree code (BMC 19.26) still applies. The city's tree regulations page lists when a permit is needed, including removing an exceptional tree, removing more than one tree in a year (more on lots over 5,000 square feet), and topping a tree or pruning more than 25 percent of its canopy. Trees under 6 inches in diameter are not significant trees, and fines run from $700 to $15,000. A trench that cuts major roots can end in a removal, so plan drain routes around large trees.

Permits in Burien

The City of Burien routes building, side sewer and other permit questions through its Permit Center. This guide doesn't list which crawl space jobs need a Burien permit, because the city decides that by scope: plumbing changes, new electrical circuits for a pump or dehumidifier, and outside work in a regulated area are the usual triggers to ask about. A like-for-like ground cover replacement is the job least likely to need one, but the Permit Center is the place to confirm it.

Who applies matters too. Agree in writing whether the contractor or the homeowner pulls any permit, and who books the inspection.

Permits and stormwater in Normandy Park

Normandy Park runs its own Permit Center and SmartGov portal. Its permits page says critical-area and shoreline applications add close to a month of review alongside building review, so a Normandy Park job near the water or on a slope needs that time in its schedule. The city's median home was built in 1962, according to Census Reporter, so many crawl spaces there are older still than Burien's.

Stormwater is the other Normandy Park rule to know. The city runs a municipal stormwater program, and private stormwater facilities must be maintained under NPMC 13.08.120 (Normandy Park stormwater). If a crawl space drain ties into an existing private system, that system's upkeep stays with the owner. The Normandy Park page has more on the city's creeks and lots.

Where sump water may go

Water pumped out of a crawl space is groundwater and stormwater. It does not belong in the sanitary sewer, which carries wastewater to a treatment plant. Burien is split among three sewer districts, Southwest Suburban, Valley View and Midway, according to the city's Hazard Mitigation Plan, and Southwest Suburban Sewer District also serves Normandy Park. Each district has its own side sewer rules, so a sump line should go to a yard dispersion point, a storm system or another route the city approves, never into a cleanout.

King County notes that side sewers are the property owner's to maintain (King County). If you see a sewer pipe leaking in your crawl space, that is a sewer repair, not a drainage job.

Contractor registration and advertising

Washington requires construction contractors to register with the Department of Labor & Industries, and RCW 18.27.100 requires their advertising to show the registration number. Look up any company on L&I Verify before signing. L&I registers contractors by specialty: under WAC 296-200A-016 the insulation and acoustical specialty covers installing and repairing insulation, and the concrete specialty includes placing film barriers, sealing and waterproofing. There is no separate crawl space specialty, so a general or a matching specialty registration is what to look for.

Disclosure when you sell

Washington's seller disclosure statement in RCW 64.06.020 asks sellers about flooding, standing water or drainage problems, about wood destroying organism or pest infestations, and about radon. A wet crawl space, rodent damage or a failed cover can touch all three answers. Dated photos of the repair are the simplest record to hand a buyer.

Frequently asked questions

What vapor barrier does Washington code require in a crawl space?

Washington's code requires six-mil black polyethylene or an approved equal over the crawl space soil, with joints lapped 6 inches and the sheet carried to the foundation wall, under WAC 51-51-0408. A thicker liner is allowed because six mil is the minimum.

Can I close my crawl space vents permanently in Burien?

Closing them for good is allowed as a design change, not a quick fix. Permanently closed vents bring in R408.3, whose two numbered items are (1) a sealed Class I liner carried 6 inches up the walls with a radon system and (2) continuous mechanical exhaust to the outside; Burien's building official, or Normandy Park's, confirms how they apply to the address. Taping the vents for a few freezing nights and opening them again afterward is just maintenance.

Do I need a Burien permit for crawl space work?

Whether you need a Burien permit depends on the scope, and the city's Permit Center decides. Plumbing changes, new circuits for a pump or dehumidifier, and outside work on a regulated slope or shoreline are the usual reasons to ask. A like-for-like ground cover replacement is least likely to need one.

Does a shoreline lot change what crawl space work is allowed?

A shoreline lot changes the outside work more than the work under the house. Burien's Shoreline Master Program covers the land 200 feet landward of Puget Sound and Lake Burien, and trees in that band need a permit to remove, so drain routes and regrading there need the city's review.

How long do Normandy Park critical-area or shoreline reviews take?

Normandy Park's permits page says critical-area and shoreline applications add close to a month, running alongside building review. Jobs on Normandy Park slopes or near the water should allow for that time before work starts.

Where can a crawl space sump pump discharge?

A crawl space sump pump should discharge to a yard dispersion point, a storm system or another route the city approves, never into the sanitary sewer. Burien's three sewer districts and Normandy Park's stormwater rules both treat groundwater and wastewater separately.

What R-value does a floor over a crawl space need in Washington?

R-30, per Table R402.1.3 of the Washington State Energy Code. Section R402.2.7 adds a placement rule: the batts must sit against the subfloor or fill the framing cavity. In a mid-sixties Burien rambler, where old batts often hang loose between the joists, the supports decide whether a new layer meets it.